Löydä esimerkkejä tuotteistamme toiminnassa:

China, Liaoning Province, Beipiao, Beipiao Power Generation


Kohde

Beipiao Power Generation, Beipiao, Liaoning Province, China 

Kuvaus

Beipiao Power Station is 1.5 km from the center of Beipiao. In 2014, the power plant reformed the desulphurisation process. At the same time, the inner wall of the chimney was protected from corrosion: ceramic stone tiles were glued to the inner wall of the chimney. In 2016 acid eruptions occurred on the outside wall of the chimney. To ensure the safe operation of the chimney, the chimney must be protected again. For corrosion protection, the PSM corrosion protection system from Köster was used in June 2019. 

Käytetyt tuotteet

Einkomponentige, chemisch- und thermisch beständige Versiegelung für mineralische Oberflächen im Kraftwerksbau
KÖSTER Acrylic Paint
KÖSTER CFR 1
KÖSTER KB-Pox CMC
KÖSTER Korjauslaasti NC
KÖSTER PSM
KÖSTER SB Tartuntaemulsio
KÖSTER TPO 1.5

Muita referenssejä

Back

Top